Preparing a dry-docking in China
What owners and superintendents should settle before the vessel arrives at the yard.
Successful dockings are won before the vessel arrives. Agree the repair specification with the yard early and in writing, with clear item numbering that both sides use in every report.
Plan owner's supply: long-lead spares, paints and class items should be confirmed and delivered to the yard before the dock date, not during it.
Appoint on-site supervision with authority to approve or reject work daily. Daily progress and cost reports keep the scope from drifting.
Finally, align class and flag surveys with the yard schedule so the vessel is not waiting on paperwork at the end.