Vessel moving.

Spare partsNingbo
Main engine parts delivered in 48 hours
- Problem
- A bulk carrier needed cylinder-head components before departure.
- What we did
- Sourced directly from the manufacturer, arranged inspection and launch delivery.
- Result
- Vessel sailed on schedule.
01
02
03

Electrical repairShanghai
Crane control system restored
- Problem
- Recurring faults on a deck crane PLC during cargo operations.
- What we did
- Fault diagnosis on board, replacement module and recommissioning.
- Result
- Cargo operations resumed the same day.
01
02
03

DockingZhoushan
Dry-dock supervised to budget
- Problem
- Owner needed independent supervision of a 21-day docking.
- What we did
- Daily progress reports, quality checks and cost control on site.
- Result
- Completed on time with no cost overrun.